Thursday, April 06, 2006

CORPS OF ENGINEERS

LEVEES

The Army Corps of Engineers have stated that the original design of the levees caused their failure. They said that the "I" shaped design of the original Levee wasn't stroge enough to hold back the flood waters.

0 Comments:

Post a Comment

<< Home